Project Title:
Coop, Pitlochry – Flood prevention
Location:
West Moulin Road
Client:
The Cooperative Food Group
Sector:
Retail

coop-logo

Dickie & Moore were appointed to stabilise the existing structures and banks of the Moulin Burn. A detailed flood prevention design was implemented that involved concrete retaining walls and stone gabion baskets to prevent further erosion and control the water course. There was also the added challenge of retaining the water flow to the Mill wheel down stream. Please watch our short time lapse film of the project.

https://vimeo.com/user25873713/review/189304496/cd39963dda